"Let me know how the pour went. I am going to be doing that in about 2 months.... Thinking about pouring a second slab in the back yard for a proper shop while I am at it."
Well, this is how it went... PITA!
Worked 12 hours straight, no break, no lunch, one swig of Mountain Dew I found left in my truck.
Mixing 43 60# bags of cement to fill 10 12"Wx3'D holes was the easy part.
The fun part was finding grade, leveling, straightening, squaring, laying out, & drilling holes in the 4x4's the base bolts to.
The "directions" say just rebar it down on level dirt, (steel carport).
Gee, let me think about that....ummmm....NO!
Some pics of how to do it right...
In two months it will be in the 20's for a HIGH temp around here, so if you want me to come down & help you build your shop, I'm already packed.