After much machining of the cast inlet ports on the head, I have now come to a halt on R&D as I have hit 4 problems, 2 of which are considerable, and 1 of these is a deal breaker in my mind.
If I didn't cut off the breather box, 3 & 4 ports had a nasty K kink in them, so it had to come off.
The Problems:-
1) There is a iron plug in the head, which presumably plugs a waterway casting, which gets in the way of machining a flat surface. It will protrude about 1/2" proud of the flat surface. This can be overcome with making a round cut out in the flange which needs to be bolted to the head.
2) There is an oil breather from the head, and another breather from the block, which need to be linked and vented into the inlet air filter or a catch tank. So a plastic T piece needs to be fitted to the head when it is fitted to the block, similar to the existing rubber tube.
3) When cutting the head flat to get a completely flat surface on which to bolt the manifold, you cut in to the camshaft area in the top of the head. This could be solved by a 60' change in the plane of the flange to be bolted to the head which Omnitech did,, but this needs complicated machining to both the head, and to the flange to be bolted to the head.
4) I think this is the deal breaker. After machining the face of the head flat, and I was cutting 10 thou off a time until I got a flat surface, there is not sufficient meat left in the head casting to drill and tap holes for stud fittings. I was hoping for 6 full turns of the 5/16" UNC thread. I don't think I can find sufficient places where this depth in metal remains after machining the face of the head flat. I have drilled many holes into the head in suitable fixing places, but very few are now suitable.
I looked at the manifold Omnitech had bolted to the head, worked out where their holes were drilled, but there just was not enough meat there to cut 6 turns. With the shear force of the 2 x 40DCOEs wobbling up and down, you need decent a large number of fixings for the manifold to the head. I think 8 studs would be good, 6 a bare minimum, but I can only find about 3 decent fixing points, and these are all in a line in the middle of the inlet port, so not of sufficient top and bottom spacing to prevent shear from the inevitable carb wobble.
Therefore my research will stop unless I get some inspiration to solve these problems.
I have taken a photo of the 4 problems listed above, and will post mid week when I can reduce the file size of the photo.
My investment in time has been considerable, about 12-14 days so far, my investment in machinery has been a lathe £1200 with cutting bits, a milling machine about £750 with milling cutters, and a belt sander machine about £200 with the sander belts etc. I just hope I
find things to use these for to justify this expense. Well, as they say, nothing ventured, nothing gained, and if you don't try, you will always be wondering "what if".
My next challenge is to get the soda blaster working so I can clean up all the rusty and dirty parts easily. Cleaning cast ally is the challenge, so I will try to work out how to use the pressure blasting cabinet I have bought. I had to buy an extractor fan to join to the side to remove all the dust, as when you start blasting, you can see FA without extracting the dust.
Alex in Norfolk.